High-Speed Rail GroupHigh-Speed Rail Group
  • About us
  • Membership
  • Industry News
  • Events
  • Publications
  • Apprentice Network

off-site manufacturing

Industry News

Engineers assemble off-site manufactured viaduct

HS2 is assembling the UK’s first major railway viaduct to be entirely manufactured off-site. Unlike more traditional viaduct designs, and as a major step forward for viaduct design, every major element of the 880m long Thame Valley Viaduct is being manufactured in a factory before being slotted together on site, Read more…

By Deborah, 2 years14 August 2023 ago
Twitter
Tweets by HSRG
Recent Posts
  • HS2 bridge ready to be moved into place in central Birmingham
  • HSRG Apprentice Network Conference 2025: Showcasing the Future of High-Speed Rail
  • First platforms installed at Old Oak Common for HS2
  • © High Speed Rail Group, 2020
  • Contact us
  • FAQs
  • Useful Links
  • Privacy Policy
  • Site by Yellowfields
Hestia | Developed by ThemeIsle