Keeping HSR to Scotland in the fast track

It may have been 6 years since Fast Track Scotland was published (which set out the case for Scotland’s inclusion in a UK wide high speed rail network) but the momentum to drive forward this vision is still going strong. Thanks to a tight operational relationship with colleagues from DfT and Network Rail, 2017 was a  whistle-stop year for High Speed Rail Policy at Transport Scotland (TS), and we are (more…)

The New Wonder Woman for HS2!

As the only female student on my course at the National College of High Speed Rail (NCHSR), I have found breaking down stereotypes to be an integral part of my education. Engineering and rail are both industries overwhelmingly dominated by men, so as much as learning about high speed rail Read more…

Jacobs – empowered to deliver

Jacobs graduate geotechnical engineer, Laura King, shares her insight of working on the multi-billion dollar California High-Speed Rail project, and what she’s looking forward to bringing to her next role on High Speed 2. The $64 billion California High-Speed Rail (CAHSR) project* will provide a 220 mph train service over Read more…