High-Speed Rail GroupHigh-Speed Rail Group
  • About us
  • Membership
  • Industry News
  • Events
  • Publications
  • Apprentice Network

off-site manufacturing

Industry News

Engineers assemble off-site manufactured viaduct

HS2 is assembling the UK’s first major railway viaduct to be entirely manufactured off-site. Unlike more traditional viaduct designs, and as a major step forward for viaduct design, every major element of the 880m long Thame Valley Viaduct is being manufactured in a factory before being slotted together on site, Read more…

By Deborah, 3 years14 August 2023 ago
Twitter
Tweets by HSRG
Recent Posts
  • HSRG statement on HS2 reset announcement
  • HS2 celebrates completion of tallest bridge ahead of complex launch operation
  • Response to re-introduction of amended High Speed Rail (Crewe – Manchester) Bill
  • © High Speed Rail Group, 2020
  • Contact us
  • FAQs
  • Useful Links
  • Privacy Policy
  • Site by Yellowfields
Hestia | Developed by ThemeIsle