High-Speed Rail GroupHigh-Speed Rail Group
  • About us
  • Membership
  • Industry News
  • Events
  • Publications
  • Apprentice Network

viaduct

Industry News

HS2 makes history with Britain’s new longest rail bridge

Contractors building a new viaduct for HS2 have lowered into place its final deck segment in an operation that crowns it as Britain’s new longest rail bridge. The gently-curved 3.4 kilometre (2.1 mile) long structure on London’s north-western edge stretches across the Colne Valley near the M25 motorway and the Read more…

By Deborah, 8 months ago
Industry News

Giant cantilever structure helps build HS2’s River Tame West Viaducts

A specialist cantilever process has been used for the first time in the UK to build the first span of a 472-metre-long single track viaduct in the West Midlands. The River Tame West Viaducts carry three rail tracks in total, made up of one single track viaduct and one double-track viaduct. Read more…

By Deborah, 9 months15 August 2024 ago
Industry News

Designers cut carbon by up to two thirds on key HS2 viaducts

HS2 designers and engineers working on five key viaducts have cut their carbon footprint by up to two thirds (66%) by adopting an innovative ‘double composite’ structure which uses significantly less concrete and steel than a more traditional design. HS2 engineers at Westbury on the Buckinghamshire/Oxfordshire border have already begun Read more…

By Deborah, 1 year ago
Industry News

HS2 moves first Delta Junction viaduct section over M42/M6 link road

HS2 has moved the first huge viaduct section into place over the motorway network in North Warwickshire, a milestone for the project’s Delta Junction as HS2 reaches peak construction in the region. Contractors have used a specialist push-pull technique to move the 84 metre, 300 tonne steel viaduct section into place Read more…

By Deborah, 1 year7 March 2024 ago
Industry News

HS2 begins year-long, half-kilometre viaduct deck slide

HS2’s innovative Wendover Dean Viaduct enters a critical new stage of construction as engineers begin the job that will see almost half a kilometre of bridge deck slid into position over the next year, high above the Misbourne Valley in Buckinghamshire. The 450m-long viaduct will be the first major railway Read more…

By Deborah, 1 year31 January 2024 ago
Industry News

Options for HS2’s Balsall Common Viaduct in the West Midlands

Options for the appearance of Balsall Common Viaduct in the West Midlands have gone on display at community events locally so that local people are able to vote on colour, finish, and pattern designs as well as landscape. The Balsall Common Viaduct is a railway viaduct under construction in Balsall Common Read more…

By Deborah, 1 year ago
Industry News

Structural redesign helps HS2 cut carbon

The Edgcote Viaduct has had its carbon footprint cut by more than 13% in comparison to the previous design. The viaduct is set low into the landscape of west Northamptonshire, and at 515m-long will carry trains across the floodplain of the River Cherwell, south of Chipping Warden. It is one Read more…

By Deborah, 1 year ago
Industry News

First HS2 viaduct completes deck beam installation

A viaduct in Northamptonshire has become the first on the HS2 project to have all its deck beams installed as work on the project continues to ramp up between London and the West Midlands. The 163m long Highfurlong Brook Viaduct, near the village of Aston le Walls, is one of Read more…

By Deborah, 1 year ago
Industry News

Milestone on the Midlands section of HS2

HS2 has started production of 2,742 huge concrete segments which will be used to build the Delta Junction, a triangle-shaped series of viaducts that will take high-speed trains between London, the Midlands and the North. The deck segments – which each weigh up to 80 tonnes – are being made Read more…

By Deborah, 2 years15 August 2023 ago
Industry News

Engineers assemble off-site manufactured viaduct

HS2 is assembling the UK’s first major railway viaduct to be entirely manufactured off-site. Unlike more traditional viaduct designs, and as a major step forward for viaduct design, every major element of the 880m long Thame Valley Viaduct is being manufactured in a factory before being slotted together on site, Read more…

By Deborah, 2 years14 August 2023 ago

Posts pagination

1 2 Next
Twitter
Tweets by HSRG
Recent Posts
  • Unique tunnel portal completed to solve high-speed rail’s ‘sonic boom’
  • Second HS2 tunnelling machine completes 5-mile drive under London
  • Removal of HS2’s tunnelling machine following its 5-mile journey
  • © High Speed Rail Group, 2020
  • Contact us
  • FAQs
  • Useful Links
  • Privacy Policy
  • Site by Yellowfields
Hestia | Developed by ThemeIsle