High-Speed Rail GroupHigh-Speed Rail Group
  • About us
  • Membership
  • Industry News
  • Events
  • Publications
  • Apprentice Network

Connectivity

Industry News

HS2 makes history with Britain’s new longest rail bridge

Contractors building a new viaduct for HS2 have lowered into place its final deck segment in an operation that crowns it as Britain’s new longest rail bridge. The gently-curved 3.4 kilometre (2.1 mile) long structure on London’s north-western edge stretches across the Colne Valley near the M25 motorway and the Read more…

By Deborah, 2 years ago
Industry News

New proposal for connecting the Midlands and the North West

We welcome the Opportunity through Connectivity report commissioned by the Mayors of Greater Manchester and the West Midlands, which acknowledges that a line between Birmingham and Manchester is essential to deliver capacity and economic benefits across the North and Midlands. It is critical that HS2 Phase 1 is properly connected Read more…

By Deborah, 2 years13 September 2024 ago
Industry News

HSRG welcomes the Rail and Urban Transport Review

We welcome the launch of the Rail and Urban Transport Review by Juergen Maier and the Urban Transport Group. The report echoes our recently published 5-point plan, rightly emphasising the need for a comprehensive North-South and East-West travel strategy, as well as the critical importance of engaging the infrastructure investment community Read more…

By Deborah, 2 years23 August 2024 ago
Industry News

Giant cantilever structure helps build HS2’s River Tame West Viaducts

A specialist cantilever process has been used for the first time in the UK to build the first span of a 472-metre-long single track viaduct in the West Midlands. The River Tame West Viaducts carry three rail tracks in total, made up of one single track viaduct and one double-track viaduct. Read more…

By Deborah, 2 years15 August 2024 ago
Industry News

HSRG Respond to the National Audit Office Report

The National Audit Office (NAO) report makes clear the plan the incoming Labour government is inheriting – a truncated HS2, and a West Coast Main Line operating at capacity – is not going to help  grow the national economy, nor is it going to allow train performance on the West Read more…

By Deborah, 2 years ago
Apprentice Network Events

High Speed Rail Group Apprenticeship Conference

We recently held our third annual High Speed Rail Group Apprenticeship Conference, this year hosted by BBVS JV at HS2’s Old Oak Common. The event provided a great opportunity for our apprentices to share their experiences from across the rail industry and make connections with senior industry leaders. Key highlights Read more…

By Deborah, 2 years15 July 2024 ago
Industry News

HSRG welcomes Mattias Bjornfors to the Board of Directors

We are delighted to announce the appointment of HS1 Ltd’s Mattias Bjornfors to our board of directors. Bjornfors brings almost 20 years of experience as an economist in infrastructure and regulatory industries. Within his current role as Strategy and Regulation Director at HS1 Ltd, the operator of St Pancras International, Stratford, Read more…

By Deborah, 2 years ago
Industry News Publications

High Speed Rail: Exploiting the Potential

Our latest report states that a comprehensive long-term strategy to develop the UK’s inter urban rail network is essential for future economic growth and achieving net zero. The report urges political figures on all sides to look beyond HS2 and take a fresh approach in order to maximise the vast Read more…

By Deborah, 2 years2 May 2024 ago
Publications

Research confirms HS2 will drive £10BN economic uplift in West Midlands in next decade

Economic analysis of the areas close to HS2’s three hubs in the West Midlands – Curzon Street Station in central Birmingham, Interchange Station in Solihull, and the Washwood Heath Depot and Network Integrated Control Centre – shows dramatic increases in regeneration and investment in the last six years. Since Royal Read more…

By Deborah, 2 years9 April 2024 ago
Industry News

Final breakthrough for HS2’s longest tunnel

The second giant boring machine (TBM) building HS2 under the Chiltern Hills has now broken through at the tunnel’s northern portal, completing a journey that began in June 2021. Named Cecilia, the TBM has driven for 10 miles underground to join twin sister machine – Florence. She arrived at the Read more…

By Deborah, 2 years9 April 2024 ago

Posts pagination

Previous 1 … 4 5 6 … 22 Next
Twitter
Tweets by HSRG
Recent Posts
  • Old Oak Common: Building a Connected Railway and a Lasting National Capability
  • High Speed Rail Group Annual Conference 2026: Delivering Euston
  • Euston matters more than ever: unlocking growth through major transport infrastructure
  • © High Speed Rail Group, 2020
  • Contact us
  • FAQs
  • Useful Links
  • Privacy Policy
  • Site by Yellowfields
Hestia | Developed by ThemeIsle